In principle, each project always has got it`s individual conditions and prerequisites. However, some factors to be determined can be described as generally valid, these include:
-the total power available to the site,
- the difference between the available power and the power already consumed by the site (building services, machinery, etc.),
- planned access to the charging station (private, semi-public, public),
-desired type of billing.